Home > TSO-Operating Report > Relay protection and secondary lines

Relay protection and secondary lines

Activities implemented in the Division of relay protection in 2008

  • Division of relay protection must examine any relay minimum once a year and to prepare test protocols for it. The state Inspectorate while visiting every substation requests the test protocols. The regular annual test the Division of relay protection will realize in two test groups for relay protection and two company’s vehicles. Each group has per two AD MEPSO employees.

    Item No.

    Facility

    Projected in 2008

    Accomplished in 2008
    1.
    SS 220/110/35 kV - Skopje 1
    220 kV installation
    220 kV OHTL.Kosovo
    no.212
    220 kV OHTL.Kosovo
    no.212
    220 kV OHTL.Vrutok no.255
    Та4 220/110 kV
    Та5 220/110 kV
    Splicing bay 220 kV
    110 KV installation
    110 kV OHTL. Sk4 no.
    101/1
    110 kV OHTL. SK4
    no.110/2
    110 kV OHTL.Zeleza. no.
    123А и 123B
    110 kV Zeleza. no.
    124А и 124B
    110 kV OHTL G. Petrov no.
    108/3
    110 kV Splicing bay
    110 kV OHTL. Miladinovci no.125
    110 kV OHTL. Miladinovci no.126
    110 kV OHTL. G.Jankovik no.102
    110 kV OHTL. Tetovo no.104/103/3
    110 kV OHTL. V.Glavinov no.156
    110 kV OHTL. G.Baba no.157 110 kV OHTL. Kumanovo no.119/1
     

    15.03 
    16.03
    28.03
    16.03
    19.03
    19.03

    07.03
    20.03
    21.03
    21.03
    22.03
    22.03
    23.03
    23.03
    26.03
    27.03
    11.06
    11.06
    10.09
     

    13.03 
    11.03
    20.03
    20.03
    21.03
    02.04

    14.03
    14.03
    24.03
    27.03
    25.03
    17.03
    26.03
    26.03
    14.03
    27.03
    25.03
    25.03
    04.04
    2.
    SS 400/110  kV - Skopje 5
    400 kV installation
    400 kV OHTL.Kosovo no.420/1
    400 kV OHTL.SК4 no.420/2
    Transformer 400/110 kV ТА1
    Transformer 400/110 kV ТА2
    Slicing bay 400 kV Bus bar 400 kV
     
    01 и 02.10  .
    02 и 03.10
    04 и 05.10
    01 и 02.11
    03.10
    29.05
     
    22 и 23.10
    21 и 22.10
    25 и 28.07
    22 до 24.07
    29.05
    29.05
    3. SS 400/110  kV - Dubrovo
    400 kV installation
    400 kV OHTL Skopjе-4 no.421
    400 kV OHTL Thessaloniki no.422
    400 kV OHTLBitola-2 no.446
    400 kV OHTL Crvena Mogila no.448
    2ТА 400/110 kV
    1ТА 400/110 kV
    Splicing bay 400 kV
    Bus bar 400 kV
    110 KV installation
    110 kV OHTL Kavadarci no.117/1
    110 kV OHTL Stip no.448
    110 kV OHTL Bucim no.137
    110 kV OHTL Valandovo no.117/2
    110 kV OHTL  FENI no.163А
    110 kV OHTL  FENI no.163B
    110 kV OHTL  ТЕ Unit no.135
    110 kV OHTL ТЕ own no.134
    110 kV Splicing bay
    110kV OHTL Negotino no.139
    Bus bar 110 kV
    -     35 and  6 kV
     

    04 и 05.04 
    25 и 26.04
    24 и 25.09
    -
    23 и 24.04
    01.11
    08.05
    06.05

    15.04
    17.04
    07.04
    15.04
    03.04
    03.04
    08.04
    08.04
    08.05
    05.05
    07.05
    24.04
     

    09 до 11.04
    14 и 18.04
    16 и 17.09
    13 до 15.10
    30.04 и 05.05
    01 и 02.12
    08.05
    06.05

    15.04
    17.04
    07.04
    15.04
    03.04
    03.04
    08.04
    08.04
    08.05
    05.05
    07.05
    24.04
    4. SS 400/110  kV – Bitola-2
    400 kV installation
    400 kV OHTL Skopje-4 no.447
    400 kV OHTL Unit-2 no.001
    400 kV OHTL Unit-3 no.002
    400 kV OHTL Dubrovo no.446
    400 kV OHTL Florina no.446
    2ТА 400/110 kV
    1ТА 400/110 kV
    Splicing bay 400 kV
    Bus bar 400 kV
    110 kV installation
    110 kV OHTL Bitola-1 no.136А
    110 kV OHTL Bitola-3 no.169
    110 kV OHTL TPP own no.151
    110 kV OHTL TPP Unit-1 no.152
     

    28 и 29.05.
    11.09
    28.03
    27 и 28.09
    20 и 21.06
    05 и 06.06
    07и 08.06
    07.05
    06.06

    14.03
    21.05
    22.05
    23.05
     

    28 до 30.05
    23.05
    24.09
    18 и 19.07
    22 и 24.04
    21 и 22.05
    22 и 23.05
    04.06
     03.06

    17.06
    25.09
    -
    20.06
     
    110 kV OHTL Bitola-1 no.136B
    110 kV OHTL Mine  no.149B
    110 kV OHTL Mine  no.149А
    110 kV OHTL ТPP own no.181
    110 kV OHTL  ТЕ own no.153
    110 kV Splicing bay
    110 kV OHTL.Bus bar
    -     6 kV installation
    23.05
    30.05
    31.05
    13.06
    07.05
    05.05
    13 и 14.06
     01.06>
    18.06
    19.06
    20.06
    06.06
    24.09
    05.06
    04.06
    05.06
    5. ТPP - Vrutok
    220 kV installation
    220 kV OHTL Skopje-1 no.255
    ТA 220/110 kV
    110 kV installation
    110kV OHTL Jugohrom no.108/1А
    110 kV OHTL Gostivar. no.103/1
    110 kV OHTL Spilje no.111
    Splicing bay 110 kV
    Bus bar protection 110 kV
     

    16.07
    17.07

    26.06 
    27.06
    28.06
    09.07
    09.07
     

    01.04
    02.04

    26.06
    27.06
    11.06
    05.06
    30.06
    6. HPP Tikves
    110 kV installation
    110 kV OHTL Kavadarci no.114
    110 kV OHTL FENI no.165
    110 kV bus bar
     

    29.08 
    03.09
    04.09
     

    10.07
    08.07
    11.07
    7. HPP Kozjak
    110 kV installation
    110 kV OHTL Skopje-3  no.143/1
    110 kV OHTL Samokov no.143/2
     

    29.08 
    03.09
     

    29.08
    28.08
    8.
    SS  110/35/10  kV – Kocani
    110 kV installation
    110 kV OHTL Stip no.115
    110 kV OHTL М.Kamenica no.171
     

    04.09 
    04.09
     

    15.09
    15.09
    9. SS  110/35/10  kV – Berovo
    110 kV installation
    110 kV OHTL Radovis no.173
    110 kV OHTL Delcevo no.184
     

    05.09 
    05.09
     

    11.09
    11.09
    10. SS  110/35/10  kV – Delcevo
    110 kV installation
    110 kV OHTL Berovo no.184
    110 kV OHTL М.Kamenica no.170
     

    06.09 
    06.09

     
    10.09
    10.09
    11. SS  110/10  kV – М.Kamenica
    110 kV installation
    110 kV OHTL Delcevo no.170
    110 kV OHTL Kocani no.171
     

    07.09 
    07.09
     

    09.09
    09.09
    12. HPP Globocica
    110 kV installation
    110 kV OHTL Spilje no.112
    110 kV OHTL Struga no.120/1
    110 kV Splicing bay
    110 kV bus bar protection
     

    12.09
    13.09
    14.09
    14.09
     

    10.09
    11.09
    12.09
    12.09
    13. SS 110/35/10  kV – Tetovo-1
    110 kV installation
    110 kV OHTL Tetovo-2
    110 kV OHTL Polog  no.103/2B
    110 kV OHTL Skopje-1  no.104/103/3
     

    19.09
    29.10
    05.11
     

    19.10
    01.10
    07.10
    14. SS 110/10  kV – Ohrid-2
    110 kV installation
    110 kV OHTL Ohrid-1 no.183
    110 kV OHTL Resen no.121/1

     
    17.09 
    25.10

     
    31.10
    17.10
    15.
     

     
    SS 110/35/10 kV -  Sopotnica
    -   110 kV installation
    110 kV OHTL Bitola 1 no.107/2
    110 kV OHTL Kicevo no.107/1
     

    24.04
    09.05
     

    15.05
    15.05
    16.

     

     
     
    SS 110/35/10 kV – Oslomej
    -  110 kV installation
    110 kV OHTL Kicevo no.106/2
    110 kV OHTL Gostivar no. 188
    110 kV OHTL Samokov no. 144
    110 kV Splicing bay


    08.05
    10.05
    21.08
    21.08
     

    14.05
    16.05
    27.05
    16.05
    17.

     

     
    SS 110/35 kV – Silmak
    110 kV installation
    110 kV OHTL Vrutok  no.108/1А
    110 kV OHTL SK 3  no.108/1B
    110 kV OHTL SK1-Tet 1 no.104/103/3
    110 kV Splicing bay
     

    26.06
    26.06
    22.06
    22.06
     

    31.07
    31.07
    31.07
    31.07
    18. SS 400/110/35 kV - Skopje 4
    400 kV installation
    400 kV OHTL Bitola 2  no.447
    400 kV OHTL Dubrovo  no.421
    400 kV OHTL Skopje 5  no.420/2
    ТР1 400/110 kV
    ТР2 400/110 kV
    Splicing bay 400 kV
    Bus bar protection 400 кV
    110 kV installation
    110 kV OHTL SK3 no.130/1
    110 kV OHTL Aerodrom no.138 B
    110 kV OHT East no.138А/1
    110 kV OHTL SK2 no.110/1
    110 kV OHTL SK2 no.130/2
    110 kV Splicing bay
    110 kV OHTL SK1 no.110/2
    110 kV OHTL SK1 no.101/1
    110 kV OHTL Refinery no.145
    110 kV OHTL Veles no.101/2
    110 kV OHTL EVP-Dracevo no.142
    110 kV OHTL South New no.182/А
    110 kV OHTL South New no.182/B
    Bus bar protection 110 kV
    -    35 kV  installation
    ТР 3 35/0,4
    ТР 4 35/0,4
     

    (21,22) -05
    (26,27) -03
    (03,06) -10
    (21,22) -04
    (05,06) -05
    27.03
    02.07

    05.03
    12.03
    12.03
    07.03
    20.03
    06.03
    18.03
    17.03
    14.03
    10.03
    06.03
    11.03
    11.03
    01.07

    19.03
    19.03
     

    (29,30) -05
     09 и 10.04
    20 и 21.10
    12 и 13.05
    27 и 28.05
    09.04
    28.08

    28.02
    11.03
    11.03
    16.04
    28.02
    18.08
    14.03
    14.03
    15.08
    13.03
    18.08
    10.03
    10.03
    27.08

    05.03
    05.03
    19. SS 110/20 kV - Skopje 3
    110 kV installation
    110 kV OHTL Kozjak  no.143/2
    110 kV OHTL Jugohrom no.108/1B
    110 kV OHTL Kozle no.154АB
    110 kV OHTL West no.133АB
    110 kV OHTL SK4 no.130/1
    110 kV OHTL G.Petrov no.108/2
    110 kV Splicing bay
     

    27.08
    25.03
    28.03
    28.03
    01.04
    02.04
    01.04
     

    08.04
    24.03
    20.03
    20.03
    25.02
    07.04
    20.03
    20. SS 110/35 kV - Skopje 2
    -   110 kV installation
    110 kV OHTL SK 4 no.110/1
    110 kV OHTL  SK 4 no.130/2
    110 kV OHTL Cement works no.129

     
    21.03
    21.03
    24.03

     
    16.04
    28.02
    10.09
    21. SS 110/20/10 kV - Gorce Petrov
    -  110 kV installation
    110 kV OHTL SK1 no.108/3
    110 kV OHTL SK3 no.108/2
     

    13.03
    13.03
     

    29.02
    07.04
    22. SS 110/20/10 kV – Kumanovo 1
    110 kV installation
    110 kV OHTL SK1  no.119/1
    110 kV OHTL Kumanovo 2 no.159/АB
    110 kV OHTL Kratovo  no.119/2
     

    04.04
    31.07
    03.04
     

    22.02
    13.08
    31.03
    23. SS 110/35/10 kV - Polog
      110 KV installation
    110 kV OHTL Gostivar  no.103/2А
    110 kV OHTL Tetovo 1 no.103/2B
     

    26.06
    27.06
     

    23.05
    11.06
    24. SS 110/20/10 kV -  Kumanovo 2
    -   110 kV installation
    110 kV OHTL Refinery no.177
    110 kV OHTL Kumanovo 1 no.159А
     

    19.09
    19.09
     

    14.08
    14.08
    25. SS110/35/10 kV – Kriva Palanka
    -  110 KV installation
    110 kV OHTL Skakavica no.180
    110 kV OHTL Kratovo no.172
     

    15.04
    15.04
     

    12.08
    26.02
    26. SS 110/20/10 kV – Probistip
    110 kV OHTL Stip 1 no.116
    110 kV OHTL Kratovo no.119/3

    17.06
    18.06

    04.09
    04.09
    27. SS 110/35/10 kV - Veles
    110 kV installation
    110 kV OHTL SK 4  no.101/2
    110 kV OHTL  Ovce Pole no.105/1
    110 kV OHTL Veles 1  no.162
    110 kV OHT Veles 2  no.113/1А
    110 kV OHT Smelter plant 1  no.127
    110 kV OHT Smelter plant 2  no.128
     

    18.04
    20.06
    19.06
    23.09
    24.06
    25.06
     

    07.05
    30.04
    12.09
    01.10
    29.04
    29.04
    28. SS 110/10 kV – Veles 1
    110 kV installation   
    110 kV OHTL Veles  no.162
    110 kV OHTL Veles 2. no.189
     

    26.09
    24.09

     
    23.09
    24.09
    29. SS 110/10 kV – Veles 2
    110 kV installation
    110 kV OHTL Veles  no.113/1А
    110 kV OHTL HIV  no.113/1B
    110 kV OHTL  Veles 1 no.189
     

    23.09
    25.09
    24.09


    01.10
    07.10
    24.09
    30. SS 110/35 kV - Ovce Pole
    - 110 kV installation
    110 kV OHTL Veles no.105/1
    110 kV OHTL Stip 1 no.105/2
     

    08.04
    08.04
     

    25.03
    26.03
    31. SS 110/35 kV – Stip 1
    - 110 kV installation
    110 kV OHTL Stip 2 no.131/1
    110 kV OHTL Ovce Pole no. 105/2
    1110 kV OHTL Probistip no. 116
    110 kV OHTL Dubrovo no. 448
    110 kV OHTL Kocani no. 115
    110 kV junction field
     

    11.04
    10.04
    11.04
    09.04
    16.04
    10.04

     
    28.03
    27.03
    03.09
    01.04
    02.09
    28.03
    32. SS 110/10 kV – Stip 2
    110 kV installation
    110 kV OHTL Stip 1 no.131/1
    110 kV OHTL Bucim no.131/2
     

    17.04
    17.04
     

    03.04
    03.04
    33. SS 110/6 kV - Bucim
    - 110 kV installation
    110 kV OHTL Dubrovo no.137
    110 kV OHTL Stip 2 no.131/2
    110 kV OHTL Radovis no.132/1
    110 kV junction field
     

    23.04
    24.04
    24.04
    23.04
     

    09.05
    27.06
    06.06
    09.05
    34. SS 110/35/10 kV – Radovis
    - 110 kV installation
    110 kV OHTL Strumica 1 no.132/2
    110 kV OHTL Bucim no. 132/1
    110 kV OHTL Berovo no. 173
     

    25.04
    25.04
    04.06
     

    03.06
    06.06
    04.06
    35. SS 110/10 kV – Strumica 1
    - 110 kV installation
    110 kV OHTL Strumica 2 no. 176
    110 kV OHTL Radovis no. 132/2
    110 kV OHTL Susica no. 140
     

    27.05
    29.05
    28.05
     

    05.06
    03.06
    15.07
    36. SS 110/10 kV – Strumica 2
    110 kV installation
    110 kV OHTL Strumica 1 no.176
    110 kV OHTL Valandovo no.118
     

    30.05
    30.05
     

    05.06
    19.08
    37. SS 110/35/10 kV - Valandovo
    - 110 kV installation
    110 kV OHTL Strumica 2 no.118
    10 kV OHTL Gevgelija no.160
    10 kV OHTL Miletkovo no.179/А
    110 kV OHTL Miletkovo no.179/B
    10kV OHTL Dubrovo no.117/2

     
    06.06
    05.06
    04.06
    04.06
    03.06
     

    17.09
    18.09
    10.10
    10.10
    20.08
    38. SS 110/35 kV – Kavadarci
    - 110 kV installation
    110 kV OHTL Dubrovo no.117/1
    110 kV OHTL Tikves no. 114
    110 kV OHTL HIV no. 113/2
    110 kV OHTL Prilep 1 no. 122
    110 kV OHTL Gradska no. 166
     

    13.05
    13.05
    08.05
    09.05
    08.05
     

    15.04
    06.05
    17.04
    02.05
    11.09
    39.

     

     
    SS 110/35 kV – Prilep 1
    - 110 kV installation
    110 kV OHTL Prilep 2 no. 148/АB
    110 kV OHTL Kavadarci no. 122
    110 kV OHTL Bitola 1 no. 109
    110 kV OHTL Prilep 3 no. 155
    110 kV junction field

     
    12.06
    11.06
    10.06
    12.06
    11.06

     
    02.07
    19.06
    22.04
    01.07
    22.04
    40. SS 110/35 kV – Bitola 1
    - 110 kV installation
    110 kV OHTL Bitola 2 no.136/А
    110 kV OHTL Bitola 2 no.136/B
    110 kV OHTL Prilep 1 no. 109
    110 kV OHTL Sopotnica no.107/2
    110 kV OHTL Bitola 4 no.121/3
    110 kV junction field
     

    16.05
    16.05
    14.05
    15.05
    15.05
    14.05

     
    17.06
    18.06
    24.04
    24.04
    29.10
    18.06
    41. SS 110/10 kV - Bitola 4
    - 110 kV installation
    110 kV OHTL Bitola 1 no. 121/3
    110 kV OHTL Resen no.121/2


    24.10
    24.10
     

    28.10
    28.10

    1. Implementation of current projects
    - 400 kV SS Stip;
    - 110 kV SS Petrovec;
    - two 110 kV line bays in SS Skopje 4;
    - two 110 kV line bays in SS Tetovo 2;
    - 110 кkV line bays in  Tetovo 1;
    - preparation of studies for the connection of ESM-EVN and participation in commissioning of relay protection;
    - 110 kV line bays in Kavadarci;
    - 110 kV line bays in Valandovo;
    - two 110kV line bays in Bunardzik;
    - preparation of studies for connection of CCHPP and putting into operation of 110 kV relay  protection.

     2. Preparation of Tender Documentation, Tender Evaluation and Implementation of      projects as follows:
    - replacement of relay protection on both ETP 400/110/10.5 kV and splicing bay in SS Skopje 4;
    - replacement of relay protection on both ETP 400/110/10.5 kV and splicing bay in SS  Dubrovo;
    - replacement of entire relay protection on 110 kV in SS Skopje 1;
    - replacement of entire relay protection in SS Bitola 2;
    - replacement of relay protection on one 110 kV line bay in SS Strumica1;
    - replacement of relay protection on one 110 kV line bay in SS Strumica 2;
    - replacement of relay protection on two 110 kV line bays in HPP Tikvesh;
    - putting into operation of busbar protection on 110 kV SS Dubrovo;
    - putting into operation of relay protection on two 110 kV line bays in SS Susica;
    - supply of spare relays and spare parts;
    - putting into operation of relay protection for the new  400 kV line bay SS Stip 1 (C. Mogila-
    BG) no. 448 in SS 400/110 kV Dubrovo;
    - participation in replacement of breakers and measuring and current transformers;
    - improvement in selectivity of relay protection through implementation of CAPE software;

    3. Trainings implemented
    For operation with the numeric distance protection relay REL670 in the Training Center of ABB manufacturer (Sweden), Zoranco Mitev and Stefce Stefanovski took part.
    For operation with the case for testing relay protection CMC 256 and operation of measuring device for parameters to transmission lines in the Training Center of the manufacturer of OMICRON (Austria) device, Todor Angusev, Ilija Elenov and Marjanco Kitanovski took place.

    Participation in the preparation of studies as follows:
    - Dynamic model of electric power model of Macedonia;
    - Production of defense plan for the transmission line of Macedonia