The Transmission System Operator (,,TSO”) is the biggest unit within the subsidiary Transmission Grid Operator (“TGO”) at AD MEPSO, Skopje. It is in charge of operation of 2135 km transmission grid and 148 power transformers of 6.417 (MVA) installed power in 73 substations.
transmission line divisiontransmission line maintenance divisionMeasurement and development divisionRelay protection and secondary linesRehabilitation divisionSubstation divisionTest division