Activities related to safe, continuous and quality electric power system control
- The measures to ensure conditions for safe, quality and continuous electric power system control are as follows:
- Increase in number of facilities monitored and controlled in real time. During 2008 the choice of the consultancy company was made that would produce tender documentation for supply and installation of equipment and devices to implement the division between the Distribution and/or Generation. In the course of 2008 mutual working groups were working with EVN Macedonia to make division between MEPSO and EVN. Works were done on the construction of the new SS 400/110 kV Stip.
- Further furnishing of the existing facilities – upgrading of the existing system for chronological registration of events is underway with the aim to complete the SCADA systems in SS Skopje 4 and SS Dubrovo. Equipment was purchased and installed for monitoring and controlling of the new OHTL bay-interconnection with Bulgaria in SS Dubrovo.
- Within the framework of executing the agreement between MEPSO and SIEMENS, Greece, selected as the best tenderer at the international tendering, activities for supply and installation of SCADA/SAS systems in SS Petrovec and SS Tetovo 2 are underway. SCADA systems distributed are subject to implementation based on SICAM PAS systems with implemented distributed BCU and protection devices.
▪ Staff training in the domain of systems for monitoring and controlling was conducted about BCU and SCADA as the part of the agreed obligations by SIEMENS, an agreement for the new OHTL to Bulgaria.
- Projects related to supply and installation of equipment for division between AD MEPSO and EVN-Macedonia are in process of implementation (projects related to delivery and installation of equipment in the domain of monitoring and controlling of the systems, protection and continuous supply, credited by the World Bank).