Испрати по е-пошта

Interconetion 400 kV line Bitola - Elbasan

Interconetion 400 kV line Bitola - Elbasan
Interconetion 400 kV line Bitola - Elbasan
Construction of 400 kV OHTL interconnection from SS Bitola 2 to Macedonian/Albanian border and SS 400/110 kV Ohrid

400 kV interconnection transmission line Bitola (Macedonia) - Elbasan (Albania) is the last part of the implementation of the Corridor 8 in the context of creating a corridor East-West power transmission corridor between Bulgaria, Macedonia, Albania and Italy. Within this interconnection is envisaged construction of a new 400/110 kV substation in the Ohrid-Struga region, which would resolve the problems that exist in the south-western part of the transmission network.
Thisproject is one of three projects in Southeast Europe which was interesting for the community of donors/financiers of energy projects by the European Commission (donors/financiers who finance the IPF Multi program in which established a new instrument to support economic development in the region - the Western Balkans Investment Framework (WBIF)). On the Steering Committee of WBIF was approved grant for preparation of Feasibility Study and ESIA for this project. Project was named WB4bis-REG-ENE-01 and will be realized by consortium of international experts led by COWI (DK). Donors/financiers of this project are the European Bank for Reconstructionand Development (EBRD) and KfW.



Feasibility Study and ESIA for Elbasan (AL) - Bitola (MK)400 kV Transmission Line

1_400kV MK-Al-ESIA REPORT_final

2_400kV MK-AL-ESIA.Appendix 1.1

2_400kV MK-AL-ESIA.Appendix 1.2

2_400kV MK-AL-ESIA.Appendix 1.3

2_400kV MK-AL-ESIA.Appendix 1.4

2_400kV MK-AL-ESIA.Appendix 1.5.1

2_400kV MK-AL-ESIA.Appendix 1.5.2

2_400kV MK-AL-ESIA.Appendix 1.6

2_400kV MK-AL-ESIA.Appendix 1.7

2_400kV MK-AL-ESIA.Appendix 1.8

3_400kV MK-AL-ESIA Non Technical Summary

4_WB4bis.MKD ESIA ESAP.30.11.2012

5_WB4bis.MKD.ESIA.SEP.STAKEHOLDER ENGAGEMENT PLAN.14.10.2012

Macedonian Stakeholder Engagement Plane,June 2015

Land Acquisition and Compensation Framework (LACF)

Project Updated Non-Technical Summary 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS Ohrid

Environmental and Social Action Plan 400kV Transmission Line, SS Bitola 2 – Macedonian/Albanian border and SS Ohrid
Intention for project implementation


Summer report on As.Study of birds and bats along 400 kV OHTL MKD_AL

Autumn report on As.Study of birds and bats along 400 kV OHTL MKD_AL

Winter  report on As.Study of birds and bats along 400 kV OHTL MKD_AL